Project Name : Baqa Waste Water Treatment Plant (JV)
Client : Water Authority
End Date : 1987
Project Value : 4 540 800 JD
Scope :
Building of a complete waste water treatment plant including the primary and secondary water filtration facility, water chlorination unit, water reservoirs and all related electro-mechanical works & utilities.
Project also included building the plant administration and staff offices.
HIGHWAYS AND INFRASTRUCTURE
Irbid – Jerash Highway Sec 3
Project Name : Irbid – Jerash Highway Sec 3
Client : Ministry of Public Works and Housing
End Date : 1992
Project Value : 16 000 000 JD
Scope :
Highway construction of 17 km dual carriageway with central New Jersey concrete barriers. Project includes 2 main interchanges,2 concrete underpasses, one pre-stressed bridge, one concrete girder bridge, box culverts, drainage structures, traffic control devices, drainage and protection works, street markings and signage.
Bulk quantities: 11 million cu m earth works, 240,000 cu m base course, 120,000 tons asphalt, 30,000 cu m concrete works, 4,000 tons steel re-bar, 40,000 cu m gabion works. Executed as a J.V.
Wadi Haddada Tunnel
Project Name : Wadi Haddada Tunnel.
Client : Municipality of Greater Amman.
End Date : 1997
Project Value : 3 500 000 JD
Scope :
Construction a of tunnel of 12m dia. and 200 m length in downtown Amman. The tunnel consists of a two lane road with a central divider and New Jersey side barriers, a concrete on/off raised deck slab ramp at one end and various road and pavement works around the tunnel entrances. MEP works included lighting, ventilation and drainage works.
Construction of New Runway at Muwaffaq Salti Air Base
Project Name : Construction of New Runway at Muwaffaq Salti Air Base.
Client : Royal Jordanian Air Force
End date : 2003
Project Value : 9 000 000 JD
Scope :
The executed project consisted of expansion works for a military air force base located in the Jordanian Azraq desert.The project included the design and construction of a military runway and support facilities for a military airfield.Project included a 2,000+ m asphalt runway and 2,000+m taxiway, re-enforced concrete landing and take-off pads,re-enforced concrete aprons, jet fighter bunkers, lighting and electric networks and sub stations, water drainage networks,perimeter fencing, road and runway markings.
Abdali – a New Downtown Infrastructure Development
Project Name : Abdali – a New Downtown Infrastructure Development.
Client : Saudi Oger ltd / Abdali Co.
End Date : 2006
Project : 10 000 000 JD
Scope :
This project consisted of site clearing of 300,000 sq m from obstacles and the construction of the infrastructure for a new urban development project situated on a former military base in immediate proximity of the General High Command of the Jordanian Military.
Works included the complete infrastructure networks including storm water drainage networks, sewage networks, water networks, medium and low voltage electric networks and sub stations, irrigation and firefighting networks, telecommunications networks, road works, street lighting, water reservoirs, concrete structures, and road paving.
Saraya Aqaba Roads 13/14/15 Infrastructure And Construction
Amman Development Corridor Phase I Sec II
Project Name : Amman Development Corridor Phase I Sec II
Client : Ministry Of Public Works And Housing/China Chongqing International Construction Company (CICO)
End Date : 2012
Project Value : 47 000 000 JD
Scope :
Highway construction of 13.4 km dual carriageway 27 m wide with a New Jersey concrete barriers median and 32 km 12m wide service roads.
The project includes climbing lanes, 16 km of service roads, post-tension re-enforced concrete underpasses, box culverts, box girder via duct ( 300 l.m), major interchanges via duct (250 l.m), traffic control devices, telecom works, street lighting, drainage and protection works, pavement marking for traffic and highway signing.
Bulk quantities: 4 million cu m earth works, 270,000 cu m base course, 200,000 tons asphalt, 35,000 cu m concrete works, 5,000 tons steel re-bar, 170 tons pre-stressing strands.
Disi- Mudawarra to Amman Water Conveyance
Project Name : Disi- Mudawarra to Amman Water Conveyance
System Project ( from Madaba Bridge Pump Station to Naour Interchange)
Client : Disi Water Company/ Gama Power Systems Engineering and Contracting Inc.
End Date : 2012
Contract Value : 3 000 000 JD
Scope:
Construction of main water conveyance steel pipe line (1448mm diameter) extending for a distance of 3.5km including:
- All related earthworks & excavation.
- Pipe stringing, pipe installation, pipe welding, pipe laying, pipe
- coating, pipe lining, non-destructive examination.
- Major valve installations.
- Fiber optic cable installation.
- Construction of valve chambers.
- Hydrotesting.
- Road crossings .
- Back filling & surface restoration.
Upgrade of Municipal Waste Water Network for Mu’ta / Karak
Project Name : Contract No. (75/2009) Upgrade of Municipal Waste Water Network for Mu’ta / Karak
Client : Ministry of Water and Irrigation
End Date : 2013
Project Value : 11 000 000 JD
Scope:
Supply and installation of 86 km sewer networks of concrete and ductile iron pipes of 150-600 mm dia.
Supply and install ductile iron force main of 400mm dia. including all valves and fittings.
Design and construction of a waste water lifting station for the Mu’ta area including pumps, distribution boards, and all related civil and MEP works.
National Broadband Network in the Middle Region of The Kingdom
Project Name : National Broadband Network in the Middle Region of The Kingdom
Client : Ministry of information and Communication Technology(MoICT)
End Date : 2016
Contract Value : 23 681 428 JD
Scope:
Approximately (680 Km) of excavating and execution of all required civil works, the supply & installation of manholes, hand-holes, pull-boxes and accessories as per specifications.
Additionally the supply & installation of the required ducts. The ducts consists of FOUR (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube or Two (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between manholes, handholes and pull boxes, or ONE (1 1/4 inch) UPVC tubes inside ONE (4 inch) UPVC tube, installed between, handholes and pull boxes to make the transition from aerial to duct cable.
The supply, installation, and termination of approximately (1070 Km) of optical fiber cables in ducts installed within the project scope, supply and installation of required accessories (ODF, splicing enclosures, splicing boxes and optical patch panels, pigtails, etc…), splicing of the cables, and end-to-end testing of installed optical network.
Sufficient spare fiber cable shall be installed within selected manholes.
Fiber jointing with existing aerial or duct fiber cables for ring completion.