<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Masar United Contracting Co. &#187; ON GOING</title>
	<atom:link href="http://www.masarunited.com/category/projects/jordan/jordan-highways-infrastructure/jordan-on-going-highways-infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.masarunited.com</link>
	<description></description>
	<lastBuildDate>Mon, 16 Nov 2015 08:59:59 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.2.39</generator>
	<item>
		<title>Omary Highway</title>
		<link>http://www.masarunited.com/project-2/</link>
		<comments>http://www.masarunited.com/project-2/#comments</comments>
		<pubDate>Sat, 28 Mar 2015 10:40:02 +0000</pubDate>
		<dc:creator><![CDATA[uniadmin]]></dc:creator>
				<category><![CDATA[HIGHWAYS AND INFRASTRUCTURE]]></category>
		<category><![CDATA[JORDAN]]></category>
		<category><![CDATA[ON GOING]]></category>
		<category><![CDATA[PROJECTS]]></category>

		<guid isPermaLink="false">http://test.masarunited.com/?p=69</guid>
		<description><![CDATA[Project Name : Zarqa- Azraq- Omary Highway- Section 1 Reconstruction &#38; Upgrading of Zarqa- Azraq Highway Client : Ministry of Public Works and Housing End Date : 2017 Contract Value : 99 066 226 JD Scope : Construction of approximately (47.3 km) of existing road to four lanes devided highway by new construction of two lanes &#8230; <a href="http://www.masarunited.com/project-2/" class="more-link">Continue reading <span class="screen-reader-text">Omary Highway</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<p style="text-align: justify;"><span style="color: #00a4e4;"><b>Project Name :</b></span> Zarqa- Azraq- Omary Highway- Section 1<br />
Reconstruction &amp; Upgrading of Zarqa- Azraq Highway<br />
<span style="color: #00a4e4;"><b>Client : </b></span>Ministry of Public Works and Housing<b><b></b></b><br />
<span style="color: #00a4e4;"><b>End Date : </b></span>2017<b><b></b></b><br />
<span style="color: #00a4e4;"><b>Contract Value : </b></span>99 066 226 JD<b><b></b></b><br />
<span style="color: #00a4e4;"><b>Scope : </b></span><br />
Construction of approximately (47.3 km) of existing road to four lanes devided highway by new construction of two lanes adjacent to the existing road, and rehabilitation of the existing road dual carriageway with 2x 3.75 m travel lanes in each direction plus 3.0 m outer shoulder and 1.8 m inner shoulders, and a central median of 2.0 m wide.</p>
<p style="text-align: justify;">Construction of service roads at each side for about 4 km. Construction of two fully directional interchanges and three overpassess over the main road for minor cross roads, in addition to slip ramps, cross roads diversions and tapers, construction of roundabout at station 0-000, construction of retaining walls and drainings structures consisting.</p>
<p style="text-align: justify;">Relocation, realignment and diversion of existing utilities. Street lighting civil works for interchanges. Street lighting installations for the interchanges and service roads. <span style="line-height: 1.5;">Traffic signing and traffic marking. </span><span style="line-height: 1.5;">Traffic safety installations and slope protection treatments. </span><span style="line-height: 1.5;">Drainage works including culverts, dykes, slope protection and ditches.</span></p>

<a href='http://www.masarunited.com/project-2/irbid_05/'><img width="165" height="110" src="http://www.masarunited.com/wp-content/uploads/2015/03/irbid_05-165x110.jpg" class="attachment-thumbnail" alt="Zarqa- Azraq- Omary Highway- Section 1" /></a>
<a href='http://www.masarunited.com/project-2/irbid_06/'><img width="165" height="110" src="http://www.masarunited.com/wp-content/uploads/2015/03/irbid_06-165x110.jpg" class="attachment-thumbnail" alt="Zarqa- Azraq- Omary Highway- Section 1" /></a>
<a href='http://www.masarunited.com/project-2/omari/'><img width="165" height="110" src="http://www.masarunited.com/wp-content/uploads/2015/03/omari-165x110.jpg" class="attachment-thumbnail" alt="Zarqa- Azraq- Omary Highway- Section 1" /></a>
<a href='http://www.masarunited.com/project-2/attachment/43145937e9/'><img width="165" height="110" src="http://www.masarunited.com/wp-content/uploads/2015/03/43145937e9-165x110.jpg" class="attachment-thumbnail" alt="Zarqa- Azraq- Omary Highway- Section 1" /></a>

]]></content:encoded>
			<wfw:commentRss>http://www.masarunited.com/project-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
