Project Name : Irbid – Jerash Highway Sec 3
Client : Ministry of Public Works and Housing
End Date : 1992
Project Value : 16 000 000 JD
Scope :
Highway construction of 17 km dual carriageway with central New Jersey concrete barriers. Project includes 2 main interchanges,2 concrete underpasses, one pre-stressed bridge, one concrete girder bridge, box culverts, drainage structures, traffic control devices, drainage and protection works, street markings and signage.
Bulk quantities: 11 million cu m earth works, 240,000 cu m base course, 120,000 tons asphalt, 30,000 cu m concrete works, 4,000 tons steel re-bar, 40,000 cu m gabion works. Executed as a J.V.
COMPLETED
Wadi Haddada Tunnel
Project Name : Wadi Haddada Tunnel.
Client : Municipality of Greater Amman.
End Date : 1997
Project Value : 3 500 000 JD
Scope :
Construction a of tunnel of 12m dia. and 200 m length in downtown Amman. The tunnel consists of a two lane road with a central divider and New Jersey side barriers, a concrete on/off raised deck slab ramp at one end and various road and pavement works around the tunnel entrances. MEP works included lighting, ventilation and drainage works.
Construction of New Runway at Muwaffaq Salti Air Base
Project Name : Construction of New Runway at Muwaffaq Salti Air Base.
Client : Royal Jordanian Air Force
End date : 2003
Project Value : 9 000 000 JD
Scope :
The executed project consisted of expansion works for a military air force base located in the Jordanian Azraq desert.The project included the design and construction of a military runway and support facilities for a military airfield.Project included a 2,000+ m asphalt runway and 2,000+m taxiway, re-enforced concrete landing and take-off pads,re-enforced concrete aprons, jet fighter bunkers, lighting and electric networks and sub stations, water drainage networks,perimeter fencing, road and runway markings.
Saraya Aqaba Roads 13/14/15 Infrastructure And Construction
Amman Development Corridor Phase I Sec II
Project Name : Amman Development Corridor Phase I Sec II
Client : Ministry Of Public Works And Housing/China Chongqing International Construction Company (CICO)
End Date : 2012
Project Value : 47 000 000 JD
Scope :
Highway construction of 13.4 km dual carriageway 27 m wide with a New Jersey concrete barriers median and 32 km 12m wide service roads.
The project includes climbing lanes, 16 km of service roads, post-tension re-enforced concrete underpasses, box culverts, box girder via duct ( 300 l.m), major interchanges via duct (250 l.m), traffic control devices, telecom works, street lighting, drainage and protection works, pavement marking for traffic and highway signing.
Bulk quantities: 4 million cu m earth works, 270,000 cu m base course, 200,000 tons asphalt, 35,000 cu m concrete works, 5,000 tons steel re-bar, 170 tons pre-stressing strands.