COMPLETED

jersh_03

Irbid – Jerash Highway Sec 3




Project Name :
Irbid – Jerash Highway Sec 3
Client : Ministry of Public Works and Housing
End Date : 1992
Project Value : 16 000 000 JD
Scope :
Highway construction of 17 km dual carriageway with central New Jersey concrete barriers. Project includes 2 main interchanges,2 concrete underpasses, one pre-stressed bridge, one concrete girder bridge, box culverts, drainage structures, traffic control devices, drainage and protection works, street markings and signage.
Bulk quantities: 11 million cu m earth works, 240,000 cu m base course, 120,000 tons asphalt, 30,000 cu m concrete works, 4,000 tons steel re-bar, 40,000 cu m gabion works. Executed as a J.V.

WADI HADDADA 3

Wadi Haddada Tunnel

Project Name : Wadi Haddada Tunnel.
Client : Municipality of Greater Amman.
End Date : 1997
Project Value : 3 500 000 JD
Scope :
Construction a of tunnel of 12m dia. and 200 m length in downtown Amman. The tunnel consists of a two lane road with a central divider and New Jersey side barriers, a concrete on/off raised deck slab ramp at one end and various road and pavement works around the tunnel entrances. MEP works included lighting, ventilation and drainage works.

azraq_02

Construction of New Runway at Muwaffaq Salti Air Base




Project Name :
Construction of New Runway at Muwaffaq Salti Air Base.
Client : Royal Jordanian Air Force
End date : 2003
Project Value : 9 000 000 JD
Scope :
The executed project consisted of expansion works for a military air force base located in the Jordanian Azraq desert.The project included the design and construction of a military runway and support facilities for a military airfield.Project included a 2,000+ m asphalt runway and 2,000+m taxiway, re-enforced concrete landing and take-off pads,re-enforced concrete aprons, jet fighter bunkers, lighting and electric networks and sub stations, water drainage networks,perimeter fencing, road and runway markings.

saraya_04

Saraya Aqaba Roads 13/14/15 Infrastructure And Construction



Project Name :
Saraya Aqaba Roads 13/14/15 Infrastructure And Construction
Client : Saudi Oger Ltd
End Date : 2006
Project Value : 5 000 000 JD
Scope :
A four lane road loaded with full infrastructure to serve as main entrance to the Royal Palace in Aqaba Jordan.

Amman Development Corridor

Amman Development Corridor Phase I Sec II

Project Name : Amman Development Corridor Phase I Sec II
Client : Ministry Of Public Works And Housing/China Chongqing International Construction Company (CICO)
End Date : 2012
Project Value : 47 000 000 JD
Scope :
Highway construction of 13.4 km dual carriageway 27 m wide with a New Jersey concrete barriers median and 32 km 12m wide service roads.
The project includes climbing lanes, 16 km of service roads, post-tension re-enforced concrete underpasses, box culverts, box girder via duct ( 300 l.m), major interchanges via duct (250 l.m), traffic control devices, telecom works, street lighting, drainage and protection works, pavement marking for traffic and highway signing.
Bulk quantities: 4 million cu m earth works, 270,000 cu m base course, 200,000 tons asphalt, 35,000 cu m concrete works, 5,000 tons steel re-bar, 170 tons pre-stressing strands.