Al-Ahlia Extension / Package No.2

Project Name : Al-Ahlia Extension / Package No.2
Client : Asas Project Management
End Date : 2012
Project Value : 4 350 000 JD

Scope :

The Scope of works comprises complete construction of all (Skeleton Works and Sundry items) pf Al-Ahlia Extension /Package No.2

This Package is divided into three phases . Each phase is treated as a separate stage of construction related to the owners desire to keep the existing supermarket operational during all the phases of construction .

KS100DSF0057

Baqa Waste Water Treatment Plant (JV)

Project Name : Baqa Waste Water Treatment Plant (JV)
Client : Water Authority
End Date : 1987
Project Value : 4 540 800 JD
Scope :
Building of a complete waste water treatment plant including the primary and secondary water filtration facility, water chlorination unit, water reservoirs and all related electro-mechanical works & utilities.
Project also included building the plant administration and staff offices.

jersh_03

Irbid – Jerash Highway Sec 3




Project Name :
Irbid – Jerash Highway Sec 3
Client : Ministry of Public Works and Housing
End Date : 1992
Project Value : 16 000 000 JD
Scope :
Highway construction of 17 km dual carriageway with central New Jersey concrete barriers. Project includes 2 main interchanges,2 concrete underpasses, one pre-stressed bridge, one concrete girder bridge, box culverts, drainage structures, traffic control devices, drainage and protection works, street markings and signage.
Bulk quantities: 11 million cu m earth works, 240,000 cu m base course, 120,000 tons asphalt, 30,000 cu m concrete works, 4,000 tons steel re-bar, 40,000 cu m gabion works. Executed as a J.V.

WADI HADDADA 3

Wadi Haddada Tunnel

Project Name : Wadi Haddada Tunnel.
Client : Municipality of Greater Amman.
End Date : 1997
Project Value : 3 500 000 JD
Scope :
Construction a of tunnel of 12m dia. and 200 m length in downtown Amman. The tunnel consists of a two lane road with a central divider and New Jersey side barriers, a concrete on/off raised deck slab ramp at one end and various road and pavement works around the tunnel entrances. MEP works included lighting, ventilation and drainage works.

azraq_02

Construction of New Runway at Muwaffaq Salti Air Base




Project Name :
Construction of New Runway at Muwaffaq Salti Air Base.
Client : Royal Jordanian Air Force
End date : 2003
Project Value : 9 000 000 JD
Scope :
The executed project consisted of expansion works for a military air force base located in the Jordanian Azraq desert.The project included the design and construction of a military runway and support facilities for a military airfield.Project included a 2,000+ m asphalt runway and 2,000+m taxiway, re-enforced concrete landing and take-off pads,re-enforced concrete aprons, jet fighter bunkers, lighting and electric networks and sub stations, water drainage networks,perimeter fencing, road and runway markings.

diving_club_03

Royal Dive Club Hotel And Tala Bay Apartment Units



Project Name :
Royal Dive Club Hotel And Tala Bay Apartment Units
Client : Jordan Investment for Tourism Development
End Date : 2004
Project Value : 773 355 JD
Scope :
The Royal Diving Club is a three star hotel (Mess House) consisting of 69 bedrooms located on the seafront adjacent to the diving club, with a total area of 2140 m2.

abdali_04

Abdali – a New Downtown Infrastructure Development

Project Name : Abdali – a New Downtown Infrastructure Development.
Client : Saudi Oger ltd / Abdali Co.
End Date : 2006
Project : 10 000 000 JD
Scope :
This project consisted of site clearing of 300,000 sq m from obstacles and the construction of the infrastructure for a new urban development project situated on a former military base in immediate proximity of the General High Command of the Jordanian Military.
Works included the complete infrastructure networks including storm water drainage networks, sewage networks, water networks, medium and low voltage electric networks and sub stations, irrigation and firefighting networks, telecommunications networks, road works, street lighting, water reservoirs, concrete structures, and road paving.

saraya_04

Saraya Aqaba Roads 13/14/15 Infrastructure And Construction



Project Name :
Saraya Aqaba Roads 13/14/15 Infrastructure And Construction
Client : Saudi Oger Ltd
End Date : 2006
Project Value : 5 000 000 JD
Scope :
A four lane road loaded with full infrastructure to serve as main entrance to the Royal Palace in Aqaba Jordan.

KS69DSF0084

City Mall Center

Project Name : City Mall Center
Client : Al Khair Investment Co.
End Date : 2006
Project Value : 52 000 000 JD
Scope :
Construction of a shopping mall of 147,000 sq m consisting of 4 car parking basements and 4 floors of retail space and cinemas as superstructure including civil works and stone cladding works.
Bulk quantities: 105,000 cu m concrete and 11,500 tons of steel re-bar, 20,000 sq m of stone cladding. first use of post tensioning on a large commercial project in Jordan.

KS54DSF9980

King Hussein Club Building and Landscape

Project Name : King Hussein Club Building and Landscape
Client : King Hussein Club
End Date : 2006
Project Value : 539 220 JD
Scope :
Construction of a building facility with an approximate built up area of (1000m3) including all Finishing & MEP works for the club and spa.